Rajiv Raman Parajuli

Projects: Smart Tel, NSTPL, NDCL 3.5M Lines GSM (Phase I, II & III) & NCell.Position: Engineering ManagerDepartment: Engineering Project Manager (EPM), Engineering After- Sales DepartmentCompany: ZTE Corporation, Nepal Branch Office. July 2012 to July 2013:- Assistance Project ManagerO  Project:- NSTPL·           Preparation of SOW, Implementation Schedule and Responsibility Matrix, represented Engineering Team on Project Negotiation.·           Sub-con selection, SOW defining, Negotiation with Sub-con, Budget estimation, resource planning.·           Project scope, Negotiation with Costumer, finalization on Logistic plan, support on project survey report submission to HQ.·           Tracing the progress, report, coordinating with Pre-sales for support, resource planning.O  Project:- Smart Tel GSM Project·           Scope clarification, Contract negotiation·           Prepared SOW, project timeline, responsibility matrix, risk, planning Jan 2010 to July 2012:- Regional ManagerO  Project: - NDCL 3.5M Lines GSM Project Phase II & III·           Phase II & Phase III site Survey, Sites implementation, problems rectification, PAT.·           Site Maintenance follow up, work allocation to site Engineer, Ticket issue.·           Work allocation to sub-con, provide Purchase Order Request and Delivery Order.·           Progress follow and Quality inspection.·           Closing and handover of Phase II & Phase III Project Aug 2009 to Dec 2009:- RF EngineerO  工程Project: - NT 3.5M Lines GSM Project Phase INominal site planning, Coverage simulation, RF parameter planning (Frequency, LAC, CI, BSIC and Neighbors planning). Drive Test, its analysis and solution implementation. Solve costumer complains, KPI monitoring and analysis on daily basis, maintain the KPI. Capacity planning for existing network (capacity expansion and capacity shrink) 21  Nov 2008 to Aug 2009:- Telecom Site EngineerO  Project: - NT 3.5M Lines GSM Project Phase I and Ncell NepalCutover of existing Huawei BTS and implementation of ZTE B8018 and M8202 BTS in WDR, deal with E1, MW and Optical Transmission. Site rectification and alarm solving. Monitoring ZXG10 iBSC on daily basis, sites port plan and configuration of sitesTrainingsTraining Courses undertaken:--     Level A Telecom site Engineer in ZTE R&D Xi’an, China-     Microware C Level OJT Training, ZTE Nepal-     Level B PTN Training, ZTE Nepal-     Level B Quality Management, ZTE NepalTraining Conducted as a Trainer:--     On Telecom Site Engineering for ZTE local and Subcontractors for the period of 15 days in ZTE Nepal Office, Kathmandu

姓名:

电话:

留言:

电话:15378700330

地址: 郑州市 金水区东风路文博东路世博中心615-6室
开封金 明区河南大学新校区创业中心二楼D6A室
福建省 厦门市集美区杏林湾营运中心一号楼808

邮件:xungui@vip.163.com

友情链接:    诚信彩网投开户网址   抢庄牛牛游戏app   诚信彩网投首页   不思议棋牌   不思议棋牌